Advanced Portfolio

Friday, 2 November 2012

Shooting Calendar

This allowed us to film before our deadlines to ensure that everything was completed on time but without losing quality at the expense of time
Posted by Unknown at 07:39
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: aaron, corey, ryan

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ►  2013 (7)
    • ►  January (7)
  • ▼  2012 (49)
    • ►  December (9)
    • ▼  November (19)
      • Digipak editing 30/11/12
      • Editing summary and details of December shoot
      • side photo edits
      • Website design 2
      • weather forecast for second shoot
      • Edditing 2
      • Editing first try
      • The first shoot 10/11/12
      • Website Design 2
      • Website design 1
      • logistics of filming
      • PITCH
      • Previous Student digipak and website analysis
      • Equipment Hire List
      • Shooting Calendar
      • Production Schedule
      • Permission Form
      • Website Design
      • Drawn story board
    • ►  October (21)

About Me

Unknown
View my complete profile
Awesome Inc. theme. Powered by Blogger.